Facts & Figures

  • 2floors

  • 34car park spaces

  • $18.15mcost

Advantages

  • The two-floor design increases the flexibility of the library space.
  • Includes a joint foyer with the pool, achieving some of our aims to create a connected hub of facilities.
  • Creates a new open space, with good connections to Memorial Park.

Disadvantages

  • Exceeds the $16.5m budget - indicative cost is $18.15m
  • Extra funding would need to be consulted on through the Council’s draft Annual Plan.
  • Including the kindergarten creates extra complexity (and potential additional transition costs).
  • Construction programme needs to be rescheduled, which is likely to push the finish date out a few months.

Flyover and plans

optb
Option B
optb site plan
Site plan
optb aerial from south
Aerial view from the south
optb planning envelope study
Planning envelope study
optb wanaka st entry
Entry from Wanaka Street
optb memorial park entry
Entry from Memorial Park
optb moorefield rd entry
Entry from Moorefield Road
Options A and B - Full Set of Plans PDF 1.3MB

Which design option do you prefer?

74% Option B
18% Option A
6% Neither
  • Option A
  • Option B
  • Neither